日本国产一区二区三区,免费AV在线观看,少妇久久久久久被弄到高潮,扒开粉嫩小泬舌头伸进去视频

      NewsCompany news
News  ——  Company news
You must pay attention to these 12 items when installing the straight-through ultrasonic heat meter
From: 2020-07-09

Straight-through ultrasonic heat meter is a meter used to measure and display heat-carrying (cold) liquid flowing through the cold-heat exchange system to release (absorb) heat. It is mainly composed of ultrasonic flow sensor, microprocessor and matched temperature sensor. The microprocessor of the straight-through ultrasonic heat meter obtains the flow signal through the ultrasonic flow sensor, obtains the outlet and inlet water temperature signals from the temperature measuring circuit, and calculates the energy exchanged by the system according to the standard heat calculation formula. The editor of Ningbo Jingcheng Instrument will introduce to you what you need to pay attention to when installing a straight-through ultrasonic heat meter.

1. The heat meter should be handled with care. It is strictly forbidden to lift and pull the connecting wires of the sensor; it is strictly forbidden to squeeze the temperature measuring probe; it is forbidden to approach high-temperature heat sources and corrosive materials; it is forbidden to cause battery explosion and hurt people.

2. When installing the heat meter, the arrow symbol of the heat meter carrier flow direction is consistent with the system flow direction, and then the heat meter can be installed.

3. The installation direction of the pipeline should be as straight as possible, and the cross-sectional area of ​​the pipeline should not vary greatly.

4. Please try to install the heat meter horizontally; if necessary, you can install it vertically or in other ways; after installation, the back of the meter should have the effect of flat pressing or storage, but no pressure relief effect.

5. The filter must be installed in front of the heat meter (in the direction of water inlet). The control valve must be installed before and after the heat meter.

6. ​​In order to make the heat carrier pass through the flow sensor of the heat meter (above DN25), China Heating Information Network (CHINN) learned that the heat meter should have a straight pipe section before and after the meter to make the water boil evenly. The specific length of the pipe section is as follows: The diameter between the pre-meter filter and the heat meter (above DN25) should be 8 times greater than the diameter of the pipe, and the back of the meter should be greater than the diameter of the pipe. Six times the diameter; heat meters below DN25 do not require a straight section.

7. Please use the new gasket attached to the table.

8. In the process of using the heat meter, the valve on the pipeline should not be completely closed. If there is no hot water flowing through the pipe for a long time, the heat meter will freeze.

9. The heat meter is a measuring instrument. Must be checked regularly in accordance with the requirements of national standards, and the battery should be replaced during the check.

10. The water quality of the heat exchange system should be clean, softened, and free of dirt to ensure the smooth operation of the heat meter without being blocked or damaged.

11. When it is found that the instantaneous flow of the heat meter decreases significantly during normal use, the filter and pipeline should be cleaned in time.

12. Open the valve after installation and check for installation leakage.

The above is the editor for everyone to sort out the matters needing attention when installing the ultrasonic heat meter.

Scan
KEYTURE

Online

Online

Wechat

莱西市| 泸州市| 广安市| 龙江县| 金坛市| 遂溪县| 安塞县| 财经| 新营市| 威远县| 昌都县| 宾川县| 惠安县| 清徐县| 龙州县| 综艺| 谷城县| 洱源县| 广灵县| 石门县| 白玉县| 太原市| 吉安市| 洛南县| 息烽县| 剑川县| 葵青区| 贡山| 景洪市| 汕尾市| 宜丰县| 泰兴市| 上饶县| 顺昌县| 泰来县| 桐梓县| 仙居县| 临潭县| 安阳市| 富顺县| 合肥市|